Sutton Road Bridge

Following the completion of the level 1 assessment in March 2022, it was found that the connections on the moving span and the west fixed span are showing signs of weakness.
A more detailed assessment is being carried out to best understand the modes of failure and the how to locally strengthen the structure. A strengthening and repair scheme is to be developed to improve the condition and the carrying capacity of the structure.
It should be anticipated that this scheme will impact on some journeys during the works. We will look at ways to mitigate these impacts wherever possible.
In the meantime, whilst the programme is being developed, the bridge is being monitored for safety
For the latest traffic updates follow Hull CC News on X (formerly Twitter) or Facebook. Alternatively, visit Causeway one.network.
For weekly traffic and travel updates, visit Hull CC News.